Services

Flood Modelling

Flood modelling informs drainage design by simulating rainfall, water movement and system performance, to create safe, resilient and maintainable infrastructure.

What we do

Understanding water movement

With our partner Engeny, we use 12D and Tuflow for drainage assessments and flood modelling, mapping afflux and hazards and verifying mitigation against project requirements.

  • Floodplain Risk Management
  • Flood Impact Assessment
  • Hydrology and Hydraulic Assessments
  • Flood Mitigation Assessments
  • 2D and 1D Flood Modelling
  • Assessment and Design of Hydraulic structures, bridges, channels and culverts
  • Sedimentation ponds and Erosion control
  • Benefit cost Assessment for Road Safety Treatments
  • Multi criteria Analysis

How we approach it

Understand the water first

Flood modelling informs drainage design by simulating rainfall, water movement and system performance, so the infrastructure that follows is safe, resilient and maintainable.

01

Map the risk

Catchment analysis and hydrology and hydraulic assessments establish how water moves across a site before any design is fixed.

02

Model it

1D and 2D flood modelling maps afflux and hazard from proposed works, and flood impact and mitigation assessments test the options against project requirements.

03

Design to suit

Drainage networks, swales, culverts, channels and detention basins are designed from the model results, with sedimentation ponds and erosion control for the construction period.

In practice

Flood modelling on live projects

No afflux outside the boundary

On North East Link, iterations of flood modelling were run to make sure there was no afflux outside the project boundary.

A risk-based framework

For temporary works on the M80 Ring Road Alliance, Hyperon built a risk-based flood modelling framework with the Alliance team and MRPV, using 12d and TUFLOW models to map afflux and hazards. Mitigation measures were proposed and verified against project requirements.

Lower-impact drainage

Temporary drainage design favoured earthen swales and on-site basins over pits and pipes, and replaced a cess drain with lined channels while keeping pre-development flow conditions.

Standards and tools

Modelled to the right standard

Standards

Flood modelling in accordance with Melbourne Water standards, applied to the Yando, Kempston and Watsonia catchments across every temporary design stage on North East Link.

Software and partners

12d and TUFLOW, used with Hyperon's partner Engeny, alongside HEC-RAS, DRAINS, RORB and MUSIC from the team's project experience.

In practice

Flood and drainage on real projects

Flood extent and drainage network mapped across a road corridor

Transport and Infrastructure

North East Link – M80RRA Flood Modelling Works

Flood Modelling · Hydrology and Hydraulics · Flood Mitigation

Victoria

Client: M80 Ring Road Alliance (Acciona and MACA)

Transport and Infrastructure

North East Link – M80RRA Miscellaneous Drainage Works

Drainage Design · Culvert Design · Temporary Works

Victoria

Client: M80 Ring Road Alliance (Acciona and MACA)

Transport and Infrastructure

North East Link – M80RRA Zone 3200 Phase 3 Detailed Design

Concept Design · Detailed Design · Flood Modelling

Victoria

Client: M80 Ring Road Alliance (Acciona and MACA)