Services

Civil Engineering

A broad discipline focused on providing design services across the life cycle of a project. It covers the planning, design and construction support of transport infrastructure projects across road, rail and energy sectors.

What we do

Design that recognises constructability

From road layouts and intersections to drainage, barriers and temporary works, our civil design treats constructability as a key driver, so solutions are practical to build.

  • Road Functional Layout Plans
  • Intersection Design
  • Roundabout Design
  • Shared path Layout Plans
  • Storm Water Drainage Strategy
  • Storm Water Drainage Design
  • Drainage Basin and Rainwater Storage Design
  • Temporary earthworks and sedimentation ponds design
  • Aquaplaning Checks
  • Swept Path checks for standard and customised vehicles
  • Road Barrier Design
  • Signs and Line Marking Design
  • Utility and Services 3D Modelling and Space proving
  • Safety in Design
  • Temporary Works Detour and Signage Strategy Design

How we approach it

Designed backwards from the outcome

We start with the finished project and work back, testing every option against constructability, delivery program and operations before it reaches the drawing board.

01

Start with the outcome

Before we draw a line, we agree what the project has to achieve for the client, stakeholders and community. The design is then built to deliver that result, rather than the design deciding the outcome.

02

Challenge early

We ask the hard questions at concept stage. Does it suit construction, procurement and the delivery program? Does it respect Indigenous heritage? Does it support a sustainable outcome?

03

Build it in

Constructability is designed in, not checked at the end. Staging, existing assets, utilities and construction access are considered from the first concept.

In practice

Practical solutions on real projects

Straight, not skewed

On the Tonkin Highway Grade Separation tender bid, Hyperon replaced a skewed bridge with a straight one and optimised the shared path to use the existing highway footprint.

Utilities left in place

At 985 Plenty Road, South Morang, stormwater was redirected beneath the proposed footpath. That avoided changes to an APA gas main and Yarra Valley Water lines that would otherwise have been relocated.

Less cut and fill

On North East Link, freeway ramps were designed for a posted speed under 80 km/h, and an intersection was reconfigured to reduce cut and fill, supported by 3D swept paths and truck stability analysis.

Standards and tools

Built to the standards your approvals depend on

Standards

Austroads guidelines and interstate guidance, Victorian Department of Transport and Planning (DTP) standards, TfNSW requirements and Melbourne Water standards for flood work.

Software

12d, AutoCAD, MicroStation, OpenRoads, Navisworks and Bluebeam, with 3D utility and services modelling and space proofing to resolve clashes before construction.

In practice

Civil design on real projects

Transport and Infrastructure

Reid Highway Grade Separation Project

Design Management · Value Engineering · 3D and BIM Modelling

Perth, WA

Client: Georgiou / BG&E Pty Ltd

Transport and Infrastructure

North East Link – M80RRA Zone 3200 Phase 3 Detailed Design

Concept Design · Detailed Design · Flood Modelling

Victoria

Client: M80 Ring Road Alliance (Acciona and MACA)

Masterplan of a residential and mixed-use land development with roads and drainage corridors

Land Development

Access to 985 Plenty Road Development (South Morang)

Detailed Design · Drainage Design · Pavement Design

South Morang, Victoria

Client: Kanton Group