Where we work

Sectors

Hyperon applies traffic, civil and structural engineering and surface water hydrology to transport and infrastructure, renewable energy and land development projects, with constructability as a key driver.

Specialist services

Expertise beyond design

Expert Witness

Independent verification and expert witness services for geometric design and drainage.

Metro Trains Melbourne (MTM) Civil Design

Civil design for Metro Trains Melbourne, including cross-drainage structures associated with the rail corridor.

Results

What value engineering has delivered

8,680 sqm

less impact on Class A bush reserve, by delaying a ramp bifurcation to the north of the Hale Road interchange. Tonkin Highway Grade Separation.

14 to 6 months

of detour and disruption to the road network and community, with a Double P concept. North East Link Zone 3300.

12–14 to 4–6 months

to build the permanent SPUI bridge, in one stage instead of three traffic stages. North East Link Zone 3300.

Where we work

Projects across three states

Hyperon's goal is to add value for customers and communities across regional and metropolitan Australia and New Zealand. Current and recent project work spans Victoria, Western Australia and New South Wales.

Victoria

North East Link works for the M80 Ring Road Alliance, access to 985 Plenty Road in South Morang, and the Sloane Street subdivision in Stawell.

Western Australia

The Tonkin Highway and Reid Highway grade separation projects in Perth, where Hyperon provides value engineering, design management and technical challenge services.

New South Wales

Independent verification of access gate upgrades on the Golden Highway for the Central-West Orana Renewable Energy Zone.

Projects

Work across our sectors

Transport and Infrastructure

Tonkin Highway Grade Separation Project

Value Engineering · Technical Challenge Team · Bridge Design

Perth, WA

Client: NRW Pty Ltd

Access gate upgrade plan on the Golden Highway for the Central-West Orana Renewable Energy Zone

Renewable Energy

ACREZ – Central-West Orana Renewable Energy Zone

Independent Verification · Traffic Analysis · Pavement Design

New South Wales

Client: ACREZ / Barnson

Masterplan of a residential and mixed-use land development with roads and drainage corridors

Land Development

Access to 985 Plenty Road Development (South Morang)

Detailed Design · Drainage Design · Pavement Design

South Morang, Victoria

Client: Kanton Group