Services

Bridges and Structures

Hyperon designs the bridges, culverts, walls and foundations that carry roads, shared paths and drainage. We start from constructability, so structures are practical to build, maintain and fit within the delivery program.

What we do

Structures designed to be built

Our structures work sits alongside civil, traffic and flood modelling, so the bridge, the road it carries and the water it crosses are designed together. Early value engineering has replaced a skewed bridge with a straight bridge on the Tonkin Highway project.

  • Bridge Forms and Type
  • Box and Pipe Culverts
  • Retaining and Noise Walls
  • Simple Bridge Design
  • Foundations
  • Slope Protection

How we approach it

Simple, buildable and low carbon

Our structures work aims for forms that are straightforward to build and maintain, and that sit within the project footprint.

01

Choose the right form

Bridge forms and types are compared early against span, site constraints and construction method, so the simplest suitable structure carries through to design.

02

Design the supporting works

Box and pipe culverts, retaining and noise walls, foundations and slope protection are designed alongside the road, so structures and earthworks work together.

03

Build it in

Constructability is built into the design. On North East Link, carriageways thread through the bridge piers so they cause no delay to bridge construction.

In practice

Structures that cut impact on site

Straight, not skewed

On the Tonkin Highway Grade Separation tender bid, Hyperon's value engineering replaced a skewed bridge with a straight bridge.

Less wall, less clearing

Retaining walls were optimised to reduce their extent and height, and earthworks to reduce clearing of native vegetation. Delaying a ramp split north of the Hale Road interchange reduced impact on a Class A bush reserve by 8,680 sqm.

Culverts that keep things running

A precast box culvert extended the Yando Underpass for temporary works, and a box culvert under a rail access track kept the existing cess drain continuous.

Standards and tools

Designed to the standards that apply

Standards

Austroads guidelines and the standards of the road authority on each project, including Victorian DTP, TfNSW and Main Roads Western Australia.

Tools

12d, MicroStation, OpenRoads and Navisworks for design and 3D coordination, with BIM modelling used on the Reid Highway project.

In practice

Structures on real projects

Transport and Infrastructure

Tonkin Highway Grade Separation Project

Value Engineering · Technical Challenge Team · Bridge Design

Perth, WA

Client: NRW Pty Ltd

Transport and Infrastructure

Reid Highway Grade Separation Project

Design Management · Value Engineering · 3D and BIM Modelling

Perth, WA

Client: Georgiou / BG&E Pty Ltd

Transport and Infrastructure

North East Link – M80RRA Miscellaneous Drainage Works

Drainage Design · Culvert Design · Temporary Works

Victoria

Client: M80 Ring Road Alliance (Acciona and MACA)